Maximerc when I restored my 72 Crysler 241 Courier (18ft tri hull) I started in August and finished in December, I worked on it just about every weekend, the floor ond the stinger were done in the first month, it took me longer because I wanted to make sure it was done right, and for the last time.<br /><br />What takes the longest was detail, fabricating side boards, making the interior look good, placement of rod holders have 11, hanging the motor which sat for 17 years so I spent a couple of weekenda on it, replacing cables, installing stering, so it all depends on the extent of what you got ahead of you.<br /><br />Some day I need to post some pics of it.