MRneatfreak
Petty Officer 2nd Class
- Joined
- Feb 20, 2012
- Messages
- 138
The service manual is useless in this project. I got all four 9/16, one 5/8 and the two 7/16 bolts in the underwater side taken out. My buddy helped me with that then when it came time to disconnect the shift linkage said he had to leave,
.
From what I can see there is a rivet holding the linkage under the carbs that connects to the shift rod and disappears in to the lower unit? I don't see a cotter pin or snap ring for a easy disconnect? Do I need to remove the powerhead cowlings underneath to facilliate this project?
I am removing to install a new water pump kit.
Ok just found this post:
http://forums.iboats.com/showthread.php?t=529703
Crazy how the search on the forum turns up no results, but google it and it show right up.
So the bell crank just opens up and it falls down right?
Confused on the Vernatherm, is it under the square looking plate between the heads or somewhere else?
Please advise.
From what I can see there is a rivet holding the linkage under the carbs that connects to the shift rod and disappears in to the lower unit? I don't see a cotter pin or snap ring for a easy disconnect? Do I need to remove the powerhead cowlings underneath to facilliate this project?
I am removing to install a new water pump kit.
Ok just found this post:
http://forums.iboats.com/showthread.php?t=529703
Crazy how the search on the forum turns up no results, but google it and it show right up.
So the bell crank just opens up and it falls down right?
Confused on the Vernatherm, is it under the square looking plate between the heads or somewhere else?
Please advise.
Last edited: