JohngeorgeIV
Cadet
- Joined
- Apr 6, 2013
- Messages
- 16
Hey guys,
Hoping for someone with pics "mid Project"
I bought a 16.5 ft smoker craft Pro angler and he had already removed all of the plywood floor. There were a couple of strips of aluminum that went over the foam and under the plywood. BUT,,,,,Based on the number of rivet holes there were several missing and Im having trouble judging how many to put back in. Any one experienced this?
I have purchased enough replacement aluminum to put them every 14" but it apears that some of them didnt go all the way accross. Maybe for the under the floor stoorage? Any direction or ideas would be very helpful.
johngeorgeiv
Hoping for someone with pics "mid Project"
I bought a 16.5 ft smoker craft Pro angler and he had already removed all of the plywood floor. There were a couple of strips of aluminum that went over the foam and under the plywood. BUT,,,,,Based on the number of rivet holes there were several missing and Im having trouble judging how many to put back in. Any one experienced this?
I have purchased enough replacement aluminum to put them every 14" but it apears that some of them didnt go all the way accross. Maybe for the under the floor stoorage? Any direction or ideas would be very helpful.
johngeorgeiv