Kiwi Phil
Commander
- Joined
- Jun 23, 2003
- Messages
- 2,182
I have 35 cubic meters of concrete drives and parking area to put down.<br />I have not concreted for 15+ years. Then we just finished the job off with a brush (broom) finish, after sceeding it of course.<br />In this country they get the surface really smooth.<br />I have bought a hand float and a bull float (on 2.4m handle).<br />I am right up to screeding off with a screed (3.6m aluminium one).<br />Can some one walk me through what I should do and how I should do it with the floats, and when, (as in when really wet on the surface or a little stiff).<br />The last question: When do I use the edging tool to finish the edges.<br />The parking area I have split in to runs, 2.4m wide. I was going to box up, drop in steel on chairs etc and pour. Next day, remove boxing, move it sideways 2.4 and repeat the operation, ensuring I put in an edge on both sides of the join. Of course the steel in each section will not be tied. Is that a problem.<br />I would appreciate any advice.<br />I am not mixing it. Using a mini Truck with 3.4cubic meters. There are 4 of us, so we should be right if we can just work our the finer details of finishing it off nicely.<br />Cheers<br />Phillip