Hello all. I know the basics of the break-in procedure as outlined in my Mercruiser manual, but I don't recall seeing any information about if the load on the engine mattered. In other words, at what point can I start pulling skiers?
Currently I have about 6.5 hours on it, do I wait until 10 hours...do I wait until the full 20 hours?
Thanks for any opinions or insight.
Tim
Currently I have about 6.5 hours on it, do I wait until 10 hours...do I wait until the full 20 hours?
Thanks for any opinions or insight.
Tim