JasonJ
Rear Admiral
- Joined
- Aug 20, 2001
- Messages
- 4,163
Not much progress, I prepped and glassed the splashwell to the transom. My next step is to rivet the top to the hull and install the rubrail. After that I need to process the area that the side consoles used to be. I'll then foam under the floor, and build the center console. I can then apply the rubberized floor stuff and will paint from the rubrail up. I have decided to hold off painting the hull until fall. Finally, its wiring, remounting outboard, installing gas tank, battery, and hooking up controls. I bought a 6 way ciruit breaker switch panel, much more clean than wirning in a fuse box and a bunch of switches.