Re: Winter Project, Almost Done!
Took it to the river (closest launch) this AM for test runs, prior to hauling to Cayuga or Owasco Lake on Sunday. First test was to make sure none of the new holes for the smart tabs and transducer leaked. Passed with absolutly no leaks. Transducer is reading depths at all speeds, which is new to me with the Humminbird large puck. It did plow a bit too much, so will raise it some. <br /><br />First impressions of the smart tabs, bow rise is hardly noticeable, with the biggest improvement noticed on turns. Tracks like its on rails. Still have some WOT porpusing, but will wait to have the typical 2 person load before adjusting fixed trim and the smart tabs. <br /><br />Steering was tight and precise. The biggest problem with the old cable and pulley system was when the plastic started to come off cable, it would start to jump the pulleys and jam. Makes for a good surprise on higher speed turns.<br /><br />Engine ran fine, as usual, and just needed to lower the idle speed some. This engine was always easy to start. Never bothered with a battery, till now. Of course, it is even easier now. Christined the floor with its first dirt/mud. <br /><br />Anyway, looks like a go for Sunday. Hope the weather is just like today. Have to go to a wedding, or would be heading there today!