chrishayes
Senior Chief Petty Officer
- Joined
- Apr 9, 2009
- Messages
- 691
Re: 1973 wellcraft 165 sport airslot project w/ pics
Well, didnt get a lot done this weekend. Or week for that matter. The job I have been doing for the last 2 years is wrapping up this week and we had final inspections last week so, long hours, lots of stress= no night time boat work! THen this weekend for some reason( I made a post on someones thread about my wifes shoe habit, that is why I am being punished I know it) my wife decided it was time to remodel our master bath
See, we bought a complete gut of a house and I have done 100% of the work on it and to this point I am 90% done with it. 2 bedrooms need some paint and carpet and our laundry needs trim. Our master needs carpet and the bath needs gutted. We have had a whirlpool tub since the first weekend we lived there sitting in one of the spare bedrooms. Now imagine to yourself if you will a woman who likes to come out of a tub like a boiled lobster looking at this jet tub every other day while I am out in the garage playing boat
I cant believe I have made it this far!
Anyhow, my buddy John showed up at about 11am and helped me unload a toilet to go and a bathrooms worth of durarock. THen it was time to clean the craphole that I have been calling a garage! Man it was a mess. WIth that done we decided it wouldnt be right to go through a Sunday boat day without at least doing SOMETHING besides eating waffles and sweeping the floor. SO, we decided to sand all the rest of the substructure wood, sand the tank support that I PL'ed down last week and laid up its 1708 cover. Thats it. So, he is going to come back over this Friday so we can do the 2 layer 1708 wrap on the starboard outside stringer that way it cures by Sunday so we can PL down all the rest of the substructure. If we dont do that then all we will be able to do is that one stringer which would waste most of the day. until then...
Well, didnt get a lot done this weekend. Or week for that matter. The job I have been doing for the last 2 years is wrapping up this week and we had final inspections last week so, long hours, lots of stress= no night time boat work! THen this weekend for some reason( I made a post on someones thread about my wifes shoe habit, that is why I am being punished I know it) my wife decided it was time to remodel our master bath
Anyhow, my buddy John showed up at about 11am and helped me unload a toilet to go and a bathrooms worth of durarock. THen it was time to clean the craphole that I have been calling a garage! Man it was a mess. WIth that done we decided it wouldnt be right to go through a Sunday boat day without at least doing SOMETHING besides eating waffles and sweeping the floor. SO, we decided to sand all the rest of the substructure wood, sand the tank support that I PL'ed down last week and laid up its 1708 cover. Thats it. So, he is going to come back over this Friday so we can do the 2 layer 1708 wrap on the starboard outside stringer that way it cures by Sunday so we can PL down all the rest of the substructure. If we dont do that then all we will be able to do is that one stringer which would waste most of the day. until then...