BWR1953
Admiral
- Joined
- Jan 23, 2009
- Messages
- 6,278
I was looking at the KF trailer this morning and I think that I need to add some additional framing farther aft in order to keep the transom tie-downs from rubbing the new paint off the stern. Wouldn't like that a bit! 
Since the hull is going to be drying/curing for several more weeks, I have time for some "fun" trailer work.
In addition to the framing, I'll have to do some work on the bunks as well. Oh yeah, I also need to mount the trailer fenders that I bought three years ago. And the boat guide-ons that I bought several months ago.
My neighbor buddy can do the welding. And even though he's pressed for time, I'm sure that he could get it done in a month. Maybe? :lol:
Here's the current configuration:

This is with added framing.
The green area bordered in red would be the new frame extension. The green area over the bunk represents the KF and the red circles connected by the yellow line represent the tie-downs.

Since the hull is going to be drying/curing for several more weeks, I have time for some "fun" trailer work.
In addition to the framing, I'll have to do some work on the bunks as well. Oh yeah, I also need to mount the trailer fenders that I bought three years ago. And the boat guide-ons that I bought several months ago.
My neighbor buddy can do the welding. And even though he's pressed for time, I'm sure that he could get it done in a month. Maybe? :lol:
Here's the current configuration:

This is with added framing.

The green area bordered in red would be the new frame extension. The green area over the bunk represents the KF and the red circles connected by the yellow line represent the tie-downs.
