bazrfc
Seaman Apprentice
- Joined
- Feb 20, 2007
- Messages
- 47
heres my finished winter project.
i spent 3 months and a lot of energy to get this to where she is.
there was a massive crack at the bow which i got the father inlaw to weld up. after that i sealed each rivit and seams.
painted inside and out as well as a new set of motors.
stripped and buffed all the rust off the trailer.
and got the boat on the lake last week.,
i dont know how to upload pictures so i made a site.
please enjoy
http://www.shareaproject.com/pages/projectTut/p/331/
i spent 3 months and a lot of energy to get this to where she is.
there was a massive crack at the bow which i got the father inlaw to weld up. after that i sealed each rivit and seams.
painted inside and out as well as a new set of motors.
stripped and buffed all the rust off the trailer.
and got the boat on the lake last week.,
i dont know how to upload pictures so i made a site.
please enjoy
http://www.shareaproject.com/pages/projectTut/p/331/