CrazyFinn
Petty Officer 1st Class
- Joined
- Dec 12, 2016
- Messages
- 357
It was a productive day yesterday.
On Saturday, built most of the components to set up a gantry.

Yesterday morning, removed the canvas from the boat, rolled it into position (my dad's old Jeep with a hitch on the front is great for moving it around).
Set up the Gantry over the boat, unbolted and disconnected the engine...

I think the vent hoses are done... they turned into slinky toys when I pulled on them.
Engine on it's way out of the boat:
Once we got it clear, rolled the boat out from under it:
And this is the mess in the bilge once it we got the engine clear:
Feels like the fun is beginning - although I won't be doing much to the boat itself until spring. I pushed it around the house to the back yard, where I will be doing most of the work once the weather warms up in a few months.
On Saturday, built most of the components to set up a gantry.

Yesterday morning, removed the canvas from the boat, rolled it into position (my dad's old Jeep with a hitch on the front is great for moving it around).

Set up the Gantry over the boat, unbolted and disconnected the engine...


I think the vent hoses are done... they turned into slinky toys when I pulled on them.

Engine on it's way out of the boat:

Once we got it clear, rolled the boat out from under it:

And this is the mess in the bilge once it we got the engine clear:

Feels like the fun is beginning - although I won't be doing much to the boat itself until spring. I pushed it around the house to the back yard, where I will be doing most of the work once the weather warms up in a few months.
Last edited: