JDA1975
Lieutenant
- Joined
- Aug 27, 2011
- Messages
- 1,385
Re: 1982 Skeeter SS-1 Sport Fisherman Restoration...In Progress
Houston, we have touchdown.....
Cap is back on, have the deck and stringers placed but not tied in....dry fit is perfection!
Comfy place to relax!
Tank and bilge area....still plenty of storage, tank doesn't take up too much of the area
Have about 1.5" of clearance between center console and top of tank, plenty of room for the sending unit wiring
As Hannibal from the A-Team always said, "I love it when a plan comes together"....If I could afford the fiberglass right now I could have it on the water pretty quick! Not too bad considering no templates and my 2 parts were 30' feet away from each other!
Houston, we have touchdown.....
Cap is back on, have the deck and stringers placed but not tied in....dry fit is perfection!

Comfy place to relax!

Tank and bilge area....still plenty of storage, tank doesn't take up too much of the area


Have about 1.5" of clearance between center console and top of tank, plenty of room for the sending unit wiring

As Hannibal from the A-Team always said, "I love it when a plan comes together"....If I could afford the fiberglass right now I could have it on the water pretty quick! Not too bad considering no templates and my 2 parts were 30' feet away from each other!