Well, I ran out of nida bond. I poured another section on the left hand side of the boat. The mould was pictured in the last post, but here is the results.

And here is a close up of the two pours bonded together.

While it was wet, as I posted in the last post, I started working on the right hand side of the boat. I thought that last pic was the right side, but it was just pic of the left side before I poured. Here is an actual right side beginning mould.

Here is an extension of the right stringer all the way to the front of the boat. This is the point I ran out of nida bond. It almost filled the entire area. I'll just go back and fill a little more on top. It'll bond well.

I ordered another pail of nida bond, as I have to finish the right top side, and I still have about half a stringer on the left hand side to pour. I've also got the middle support walls that go in front and behind the gas tank.
After this, I'll most likely have about 3/4 of a pail(5 gallon) of nida bond that I won't be using. I paid 155$ for this pail, and it'll likely still have about 4 gallons left. Anybody in the central Texas area around Austin or Waco interested? I'll let it go for probably 100$ or so. Pretty good deal.
Matt
Well, I ran out of nida bond. I poured another section on the left hand side of the boat. The mould was pictured in the last post, but here is the results.

And here is a close up of the two pours bonded together.

While it was wet, as I posted in the last post, I started working on the right hand side of the boat. I thought that last pic was the right side, but it was just pic of the left side before I poured. Here is an actual right side beginning mould.

Here is an extension of the right stringer all the way to the front of the boat. This is the point I ran out of nida bond. It almost filled the entire area. I'll just go back and fill a little more on top. It'll bond well.

I ordered another pail of nida bond, as I have to finish the right top side, and I still have about half a stringer on the left hand side to pour. I've also got the middle support walls that go in front and behind the gas tank.
After this, I'll most likely have about 3/4 of a pail(5 gallon) of nida bond that I won't be using. I paid 155$ for this pail, and it'll likely still have about 4 gallons left. Anybody in the central Texas area around Austin or Waco interested? I'll let it go for probably 100$ or so. Pretty good deal.