Hello all, I took my boat to have electronic ignition, carb rebuilt, new
trim pump Silinoid, new impellor, new gimble bearing (which was said it
needed resleeved because Of the old one being installed crooked n that
there was a lip from the improper installation Of the old bearing. And
The old bearing was supposably not easy to remove. I supplied the bearing,
Oil seal, carb kit, impellor, anb lower unit gaskets. Does 775 sound high??
I took a new job that has me traveling full time so I couldn't do the job or b
There for progress reports personally. I did state to him that I am home every
Other weekend and I am not in a hurry 4 it but it took 7 weeks 2 finish.
Any thoughts before I pay??? Thanks
trim pump Silinoid, new impellor, new gimble bearing (which was said it
needed resleeved because Of the old one being installed crooked n that
there was a lip from the improper installation Of the old bearing. And
The old bearing was supposably not easy to remove. I supplied the bearing,
Oil seal, carb kit, impellor, anb lower unit gaskets. Does 775 sound high??
I took a new job that has me traveling full time so I couldn't do the job or b
There for progress reports personally. I did state to him that I am home every
Other weekend and I am not in a hurry 4 it but it took 7 weeks 2 finish.
Any thoughts before I pay??? Thanks