I'm pretty behind on updates, amd pictures. I thought the Stingray was finished, so next is a Cobalt. The tower was damaged, and in the process of the marina (I'm guessing marina) taking it off, they took some gel off with the bases.
Boss said just fill and spray, since it's not really structural damage. So I filled it with duraglas yesterday, and got it sprayed today.
Also working on another stingray with cracks around the bimini top brackets.
I've barely started on that at the end of yesterday, so no good pics, but I did break a screwdriver. I think they drilled holes for #8 screws and ran #10s. The heads are wedged into the countersunk recesses on the brackets.
And finally, the boss looked on the estimate for the first Stingray and saw that there was another spot to fix in the ski locker. The screw holes for the lid latch were completely stripped out. Had to do a little cutting, hand scuffing, and glassing behind the holes.