Re: Chrysler Charger 151 Winter Project (first boat)
Well the floor is in. If is fully wrapped than then has biax down the entire top. This had to be spliced on the right side because the floor was wider than the fabric I had. Lastly a 8" strip of fabric was ran half on the floor half on the hull.



Weather is to cold here now to do much more glass work but it is almost all done. Will decide what to do later about some hull repair/how to go about it.
Next step carpet, aluminum polish, vinyl and engine work.
Well the floor is in. If is fully wrapped than then has biax down the entire top. This had to be spliced on the right side because the floor was wider than the fabric I had. Lastly a 8" strip of fabric was ran half on the floor half on the hull.



Weather is to cold here now to do much more glass work but it is almost all done. Will decide what to do later about some hull repair/how to go about it.
Next step carpet, aluminum polish, vinyl and engine work.