Well it took longer and cost more than I thought, but it is worth it in the end. New transom, stringers, floor, faired hull and epoxy coated and bottom painted. New paint above water line. Added swim platform and ski pylon. Many new fittings to replace old corroded ones and change from plastic to stainless steel.
I also refurbed the trailer by changing from rollers to bunks, installing a new axle, painting the fenders with 2 part polyerethane, and getting new white spoked wheels.
Dropping in Engine
Engine Bay & Rewireing
Added a Swim Platform made from Coosa Composite
Done!!
Fired right up all electrics work incl trimtabs, marine radio and GPS-Sonar.
I also installed a ski pylon as the boat had one from the factory but it was removed when it had previous repairs. Just need to spit and polish and get it in the water tomorrow or Friday.
I also refurbed the trailer by changing from rollers to bunks, installing a new axle, painting the fenders with 2 part polyerethane, and getting new white spoked wheels.
Dropping in Engine

Engine Bay & Rewireing

Added a Swim Platform made from Coosa Composite

Done!!


Fired right up all electrics work incl trimtabs, marine radio and GPS-Sonar.
I also installed a ski pylon as the boat had one from the factory but it was removed when it had previous repairs. Just need to spit and polish and get it in the water tomorrow or Friday.