Use the battery's neg post as your main "mother earth" reference......i.e., connect the volt meter's negative lead to the batt's neg post (the lead-Pb part) and leave it there. Now using the meters positive lead probe things.....
As you probe things with the positive lead of the meter, ALL grounds (usually blk wire) even the unmarked (neg) post of the cap, if wired properly, should NOT read anything higher than 0'ish volts......If so, you have flaky ground somewhere allowing its ground to "float" up above the battery's 0V terminal voltage .......hence "8V".
Same goes with the positive stuff, with the meter's neg lead STILL attached at the "mother earth ground referance point".........Any 12VDC feeds have to be 12V'ish, else you have a flaky connection in the 12V feed lines allowing the 12V to "sag" below the battery's terminal voltage of 12V'ish