FORUM RULES UPDATED - The forum rules have been updated to continue to provide a friendly and safe environment for our member community. Please take a moment to review the updated rules and our terms of use and privacy policy. Click here for Forum Rules which has links to the 'terms of use' and 'privacy policy'.
In Other News . . .
You will notice a few enchancements to the forums to make your experience better. These include: Email Notifications, Thread Previews, Thread Starter Notation, and Emoji Options on the 'Like' icon. . .
Additionally, the merchant portions of the website have been updated and are now operational. . . . Check out iBoats for all your boating gear.
Let me add some more info. I'm replacing the floor on a 15 foot runabout. I'm going to use west systems epoxy for this and just want to know if I should just spend the money on the 5 gal. or is that going to be way to much? I know I have cracks to fill but just want to make sure I'll have enough or if that isn't going to be enough.
Smitty, Like BillP said,I think 2 gals would be more than enough, but keep in mind that epoxy, unlike polyester, is very stable and will keep for years, so if you have any additional projects you may want to get the 5 gals.
ive got a 23 footer, had to do a stringer up resto job and have at least 10 gallons so far probly gonna need 4 more gallons to finish, but i said in the other thread I may have overdid it a little, epoxy can be used for a multitude of things as well as boat work, id get the 5 gallons if i were you
Are you going to saturate the plywood I assume you using with two coats? Found a site that tested and 2 coats keeps the most water out. I would get the 5 gallon jug and make sure you get a fast and a slow hardner. You will probably need to make a paste also to fill holes and attach stuff. Get cabosil and some glass fiber 1/8" to 1/4" length.