I've done some searches but no results too specific. I have a 16.5 pontoon and thought about re-doing the siding and carpet and wondering if i could do this in two 12 hour days (sat/sun). Of course this is assuming i will re-use the plywood floor. I've watched a video on siding replacement and of course they make it look easy, which I'm sure it is (if you do it for a living :facepalm
. We would have 3 guys, 2 are very mechanically inclined / all around skillful, and me.
Just wondering if this is something to be able to shoot for, including disassembly and reassembly... or should i allot more time. I've never conquered such a large project so i'd love to hear firsthand from someone that has.
Just wondering if this is something to be able to shoot for, including disassembly and reassembly... or should i allot more time. I've never conquered such a large project so i'd love to hear firsthand from someone that has.