I'm rebuilding my new prize, I thought I would make a post and share some of the progress.
Right now I have a question some may have experimented with... I want to put my batteries below the deck, I also want to put a fish well below the deck. I have lots of depth but there is a Z support running right through the aria. Now I think these supports are mainly for the floor support, there is a gas tank that runs from the motor to the cutty stairs in the center, then a large support box channel on both sides of the gas tank, the motor mounts are on what looks like a 4x4 box channel or maybe a 4x6 box channel that run on the floor and it looks like it runs the length of the boat. I'm not thinking of cutting these only the Z support that's about 12 in from the out side of the boat, there is another one about 6 inches toward the outside of the boat from that one, and the box next to the gas tank is on the inside of the one I'm thinking of cutting about 12 inches.
My plan is to build the containers onto the bottom of the floor with plywood, then epoxy the outsides and fiberglass and epoxy paint the top and insides of the containers with all the right fittings of course. I'm not worried about building part, I'm a master wood worker with all the tools so no big deal there.
Its cutting the floor support I'm not positive about. The bottom of these are normally held in place by a single rivet into each of the "Hull TUBES" that run from side to side in these boats, so that's not any massive connection or strength there, that's what leads me to think these are only for floor support and not structural support.
Thanks for any input.. from someone who has experience at "doing stuff"
PK
Right now I have a question some may have experimented with... I want to put my batteries below the deck, I also want to put a fish well below the deck. I have lots of depth but there is a Z support running right through the aria. Now I think these supports are mainly for the floor support, there is a gas tank that runs from the motor to the cutty stairs in the center, then a large support box channel on both sides of the gas tank, the motor mounts are on what looks like a 4x4 box channel or maybe a 4x6 box channel that run on the floor and it looks like it runs the length of the boat. I'm not thinking of cutting these only the Z support that's about 12 in from the out side of the boat, there is another one about 6 inches toward the outside of the boat from that one, and the box next to the gas tank is on the inside of the one I'm thinking of cutting about 12 inches.
My plan is to build the containers onto the bottom of the floor with plywood, then epoxy the outsides and fiberglass and epoxy paint the top and insides of the containers with all the right fittings of course. I'm not worried about building part, I'm a master wood worker with all the tools so no big deal there.
Its cutting the floor support I'm not positive about. The bottom of these are normally held in place by a single rivet into each of the "Hull TUBES" that run from side to side in these boats, so that's not any massive connection or strength there, that's what leads me to think these are only for floor support and not structural support.
Thanks for any input.. from someone who has experience at "doing stuff"
PK