exnavyman123
Petty Officer 2nd Class
- Joined
- Apr 17, 2010
- Messages
- 123
I noticed today in the 1" raised area where the bilge pump is mounted with wood under the fiberglass the wood is soaked. water oozed out of the mounting hole. i opened the hole to 1/2" and sucked the water out with vac, about 14 ounces total.
I also noticed a chip in the fiberglass hull in the ski storage area about 2 inches long at most 1/32" deep. i sanded it when water oozed out about 2 tablespoons.I took pics but not sure how to post, if i could email them and have someone post them i would appreciate it. Wondering how i should proceed.
I did read the following on winner boats, i think this is how mine is constructed. :
Winner boats were the first with a 100% one piece fiberglass stringer system,
but there was still plywood in the deck and in the transoms.
The stringer system was a very innovative way to build boats.
The stringer system was made in a seperate mold and set over in the hull.
Chop strand was used in the hull along the contact points at the chines and lift strakes.
The stringer system was weighted down into the hull and the bond was made complete.
The voids between the stringer system and the hull was filled with high pressure foam.
Thanks.
I also noticed a chip in the fiberglass hull in the ski storage area about 2 inches long at most 1/32" deep. i sanded it when water oozed out about 2 tablespoons.I took pics but not sure how to post, if i could email them and have someone post them i would appreciate it. Wondering how i should proceed.
I did read the following on winner boats, i think this is how mine is constructed. :
Winner boats were the first with a 100% one piece fiberglass stringer system,
but there was still plywood in the deck and in the transoms.
The stringer system was a very innovative way to build boats.
The stringer system was made in a seperate mold and set over in the hull.
Chop strand was used in the hull along the contact points at the chines and lift strakes.
The stringer system was weighted down into the hull and the bond was made complete.
The voids between the stringer system and the hull was filled with high pressure foam.
Thanks.