Darrenmb
Petty Officer 3rd Class
Thread starter- Joined
- Oct 19, 2016
- Messages
- 76
If all goes well will.be splashing next weekend!!!!!!
boat is done, (except for a couple.of small things like installing the new seawater pump as soon as i get my question answered on the vp section, tidying up wiring which i have left exposed on purpose for easy access in case anything is awry, and the rear bench seat upholstery which sister in law is working on) i am currently working on trailer, ditches the surge brakes which were beyond repair and switching over to electric. Already swapped the recielver bit on front, and new brake plates, and bearings all.sitting waiting to be installed. Also new wheels.and tires.... wish me luck!!!!
boat is done, (except for a couple.of small things like installing the new seawater pump as soon as i get my question answered on the vp section, tidying up wiring which i have left exposed on purpose for easy access in case anything is awry, and the rear bench seat upholstery which sister in law is working on) i am currently working on trailer, ditches the surge brakes which were beyond repair and switching over to electric. Already swapped the recielver bit on front, and new brake plates, and bearings all.sitting waiting to be installed. Also new wheels.and tires.... wish me luck!!!!

