Last year I replaced the stringer under the cuddy cabin floor. After doing the beam walk the entire year, time to put an actual floor in it. I was going to use 3/4" plywood and soak it with epoxy and then apply glass to both sides. So just a couple questions?
Should the floor rest at all on...