I pretty much have the floor cut and dry fitted. I fit the two fuel tanks in, the bottom of the tanks sit about 8-10 inches below the floor. Next is to cut the hatches into the floor. I used 3/4" Exterior (not exposure-1) A-C grade douglas fir 5ply. CDX plywood uses the same waterproof glues but the overall sheet of plywood is a lesser grade. Check out the boat album<br /> http://photos.yahoo.com/kmw250 <br /><br />
