kinaiahi61
Petty Officer 1st Class
- Joined
- Nov 10, 2012
- Messages
- 215
The crack is about 5 feet long. I ground it out on one side today. Looks like just need to lay it up good. The two chines on the side of the "keel" have a crack but you can't see the other sides one. It didn't have the water bleed through like this side. After grinding all the junk out today, I'm thinking of laying two additional layers over the whole deck on top of the 6" and 12" 1708 over the chine areas, and stringer areas. Plus like WOG said earlier, need to add csm on the outside and fairing material.

