gussbuster
Seaman Apprentice
- Joined
- Nov 19, 2006
- Messages
- 39
So Ive decided to rip out my floor on my 20' Quantum and replace it. It doesnt really have any soft spots but it was redone once before I bought it and it wasnt done correctly. While the deck wood is solid, there is a gap between the deck and the stringers. Needless to say, its a bouncy ride down the lake. I will start the tear out this weekend and will post pics of what I have and of my progress. I pray my stringers are in good shape, I really dont want to have to replace them too. Of course I will if need be. I have been looking at a lot of threads on the replacement process and Im sure this answer is in one of them. My question is, is it possible to use one layer of 1708 vs 3 layers of CSM or is that not a good idea? I want to do it right, but if I can save steps, I definitely will.