This weekend I am going to Lowes to buy the 1/2"" Arauco plywood for the stringers, transom and deck. Lowes will also supply the 2x8s for bracing the hull to the trailer, and the PL for stringer bedding.
The stringers will be 2 layers of ply for a total thickness of 1" (the same as the old stringer thickness) and they will be 12' long.
The transom will be 2 layers of ply for a thickness of 1" of ply on the whole transom. I will have to then add a piece in the outdrive area that tapers in thickness from 3/4" at the top to 1/2" at the bottom (because of the transom skin thickness variation I mentioned before). The transom will then be a consistent 2" thickness everywhere at the outdrive cutout.
The PL is much cheaper to buy in the large cartridges, even when you factor in buying the large gun ($10).
With the US Composites order scheduled to arrive today, I should have everything I need to start the rebuilding this weekend.
I will probably take 3 or 4 days off from work so I can work all day on the glassing to finish it ASAP.
Steve
This weekend I am going to Lowes to buy the 1/2"" Arauco plywood for the stringers, transom and deck. Lowes will also supply the 2x8s for bracing the hull to the trailer, and the PL for stringer bedding.
The stringers will be 2 layers of ply for a total thickness of 1" (the same as the old stringer thickness) and they will be 12' long.
The transom will be 2 layers of ply for a thickness of 1" of ply on the whole transom. I will have to then add a piece in the outdrive area that tapers in thickness from 3/4" at the top to 1/2" at the bottom (because of the transom skin thickness variation I mentioned before). The transom will then be a consistent 2" thickness everywhere at the outdrive cutout.
The PL is much cheaper to buy in the large cartridges, even when you factor in buying the large gun ($10).
With the US Composites order scheduled to arrive today, I should have everything I need to start the rebuilding this weekend.