Bimmerknut
Seaman
- Joined
- Oct 25, 2010
- Messages
- 71
For those who haven't seen my earlier posts this week on my 1988 Force 35HP motor, I've completely removed and disassembled the lower end and installed a new yoke, O-ring and seal kit and impeller.
I should have taken pic of the shift hex nut on the shift linkage before I removed the lower end from the motor. I'm about ready to bolt the lower end back up into the motor and after a lot of searching I'm not finding a lot about this. Before I begin, what position should the throttle be in? I've had it in neutral the whole time. Are there precheck steps I need to take before starting the motor to ensure the linkage is exactly where it needs to be?
If I could get some detailed instruction, that would be very much appreciated.
I should have taken pic of the shift hex nut on the shift linkage before I removed the lower end from the motor. I'm about ready to bolt the lower end back up into the motor and after a lot of searching I'm not finding a lot about this. Before I begin, what position should the throttle be in? I've had it in neutral the whole time. Are there precheck steps I need to take before starting the motor to ensure the linkage is exactly where it needs to be?
If I could get some detailed instruction, that would be very much appreciated.