TrybalRage
Seaman
- Joined
- Mar 2, 2010
- Messages
- 60
Had a really productive weekend. Hardware installed - new scuppers (boy did I make a mess with the 4200) from TH Marine, tie down/lifting rings installed, drain plug, stainless thru hull for bilge pump drain, and more.
Also not pictured - new 2AWG battery cable run from console to relocate battery there, Perko switch installed so I'm ready for a second if desired, cleaned up some sketchy connectors and added heat shrink to those spots.
Finally - motor hung yesterday!
I ordered a new bilge pump rather than install the original 16 year old one, so that's the last thing that needs to go in. Hoping to splash this week.

Also not pictured - new 2AWG battery cable run from console to relocate battery there, Perko switch installed so I'm ready for a second if desired, cleaned up some sketchy connectors and added heat shrink to those spots.
Finally - motor hung yesterday!

I ordered a new bilge pump rather than install the original 16 year old one, so that's the last thing that needs to go in. Hoping to splash this week.