Re: 1978 16' Starcraft SuperSport Resto
So much for working again today... Went out when I had some time, and the stuff going on yesterday must have carried over...
Put down some PL with a caulk gun I borrowed. Gun worked much better, so that's a plus.
Then put down the deck, and lined it up nicely. Drilled a hole near the rib, filled the hole with some 5200 then put in my rivet. I made sure to have all the weight in that area, and tightened the rivet. Though it was tight, and I steped back, and up comes the deck :facepalm:.
Thought that I may have hit close to the old hole so I moved to the next rib, and did the same thing just a bit farther back. Put in the rivet, stood in the spot, and it did the same thing.
Tried that in a couple more spots, then brought out the screws... Drilled into the first rib I had tried, and put the screw in with some 5200. Thought it was holding, then tightened it up with the drill, and pop up came the deck. :Facepalm:. Well that didn't work. Tried another screw, and my drill bit broke. So I called it, and headed in. Boat 2, Boatguy 0
. Here's a picture of my fails...
When I go back I'm going to have to get the deck piece up (got one rivet to hold), and scrape off the pl and start over...
------------------
So any suggestions as to what I'm doing wrong, or how to go about this would be great. I'm thinking I shoul go with a couple more screws than rivets now. I just hope I didn't order my rivets too long. I think they are fine, just have no idea what I am doing wrong... Sorry to put my problems on here, but I'm almost thinking of giving up right now even though I have came somewhat far.
So much for working again today... Went out when I had some time, and the stuff going on yesterday must have carried over...
Put down some PL with a caulk gun I borrowed. Gun worked much better, so that's a plus.
Then put down the deck, and lined it up nicely. Drilled a hole near the rib, filled the hole with some 5200 then put in my rivet. I made sure to have all the weight in that area, and tightened the rivet. Though it was tight, and I steped back, and up comes the deck :facepalm:.
Thought that I may have hit close to the old hole so I moved to the next rib, and did the same thing just a bit farther back. Put in the rivet, stood in the spot, and it did the same thing.
Tried that in a couple more spots, then brought out the screws... Drilled into the first rib I had tried, and put the screw in with some 5200. Thought it was holding, then tightened it up with the drill, and pop up came the deck. :Facepalm:. Well that didn't work. Tried another screw, and my drill bit broke. So I called it, and headed in. Boat 2, Boatguy 0

When I go back I'm going to have to get the deck piece up (got one rivet to hold), and scrape off the pl and start over...
------------------
So any suggestions as to what I'm doing wrong, or how to go about this would be great. I'm thinking I shoul go with a couple more screws than rivets now. I just hope I didn't order my rivets too long. I think they are fine, just have no idea what I am doing wrong... Sorry to put my problems on here, but I'm almost thinking of giving up right now even though I have came somewhat far.