zuluwarrior
Petty Officer 2nd Class
- Joined
- Sep 11, 2010
- Messages
- 109
Re: Cobia 24' rebuild project.
Yeah the stringers and bulkheads will all be up off the hull minimum 1/4". Right now I'm just building a jigsaw puzzle of the components if you will. All final trim and fit will have the foam shims in place. There will be a drain tube under the tank. The plan is for the tank to rest on a platform inside the opening and be a sealed area. Drain tube will run under that. Even after deciding to pack up and just relax I had a cold one(beer) and the radio was playing in the background I break out the vise grips and started in on the bolts that where holding down the Helm seat bases. Let me say I tried this same tool before with no success, well it must have been a good beer cause I got both removed. Felt pretty good after that.
Yeah the stringers and bulkheads will all be up off the hull minimum 1/4". Right now I'm just building a jigsaw puzzle of the components if you will. All final trim and fit will have the foam shims in place. There will be a drain tube under the tank. The plan is for the tank to rest on a platform inside the opening and be a sealed area. Drain tube will run under that. Even after deciding to pack up and just relax I had a cold one(beer) and the radio was playing in the background I break out the vise grips and started in on the bolts that where holding down the Helm seat bases. Let me say I tried this same tool before with no success, well it must have been a good beer cause I got both removed. Felt pretty good after that.