Got all the thru hull fittings secured and sealed with 3M5200, bilge pump and float switch mounted, livewell pump installed, and all livewell fittings installed and sealed in the center console as well. After a 7+ day cure, I'll get the Shields 149 hoses cut to length and attached. Will finish...