I/O (Sterndrive) Conversion to Outboards

tpenfield

Moderator
Staff member
Joined
Jul 18, 2011
Messages
19,097
The sun is shining so I'm doing some more glassing. I did the crossbar pieces over the past couple of days, and today I glassed the center stringer . . . 4 layers wet-on-wet.
.
IMG_9478.JPG
.
With the sun out, temperatures in the boat are 80˚F, even though it is only 60˚F outside. To keep the coldness out I put some plastic over the transom cut-outs and set them in place. It's a good thing I didn't toss them :p
 

Scott Danforth

Grumpy Vintage Moderator still playing with boats
Staff member
Joined
Jul 23, 2011
Messages
52,350
Ted, will you be adding shelving to hold the beer er provisionings in the old bilge area? if you need a design for a service elevator, let me know. we did one that brings a blender and booze from below deck galley up to the cockpit. 2 ball-screws, a kevlar belt and a small DC gear motor. it would raise and lower up to 150#
 

tpenfield

Moderator
Staff member
Joined
Jul 18, 2011
Messages
19,097
The center stringer support is done. I do plan on putting in a floor of some sort to make for a decent storage area.

I did another test fit and decided to go up a 'wee bit' on the spacers. (0.45" up from 0.35"). The thinner ones were a 'smidge' too tight on the sides.

The alignment with the keel was dead nuts on as per my laser line tool, so I hope to replicate that with the thicker spacers.
 

Attachments

  • IMG_9479.JPG
    IMG_9479.JPG
    387 KB · Views: 0
Top